Kunes RV Price

$150,094
1/57

2018 Tiffin Motorhomes® Tiffin Allegro Breeze

32BR

•

38,662

miles
$1,146
per month
7.99
% APR
20%
Down
180
Months

Features

Vehicle Location

Kunes Wisconsin RV World

5920 Haase Rd, DeForest, WI 53532

View all vehicles at this location

Estimate your payment

Get a quick payment estimate based on basic loan terms.

Get pre-qualified in just a few taps

When you're searching for the perfect vehicle, it helps to know if you qualify for the financing you need. Get pre-qualified in just a few taps, with no effect on your credit score.

Powered by

motive logo

Directions

Kunes RV provides more information about each RV than any other RV website. Our goal is to give our shoppers the most complete view of features, specifications, floor plans, and appearance.


Some details shown may only apply to specific models or trims of the RV you’re viewing, and certain features may vary by unit. If you need to confirm something specific, please give us a call, review the photos, or submit an inquiry. And if the feature you want isn’t included on this unit, our team can often upfit or modify the RV to make it happen.

Basic information

Stock #

VIN

Description

TIFFIN ALLEGRO BREEZE

(2017) These Typical Features Vary by Model
Full Body Paint, Protective Front Film

Breeze PowerGlide Chassis
Cummins ISV5.0 V8 Turbo Diesel Engine
275 HP 560 lb-ft Torque
170-Amp Alternator
Allison 6-Speed Automatic
Lock-Up Independent Front Suspension
Air Ride Suspension
Exhaust Brake
Full Air Brakes
4500# Hitch

Cab Features
One-Piece Tinted Windshield
Power Windshield Solar Privacy Shades
Manual Side Solar Privacy Shades
Power Leatherette Cab Seats
Lighted Instrument Panel
Diagnostic System Dash Gauges
Heated Power Mirrors
Dual Dash Fans
Backup Monitor
Side-View Cameras Turn-Signal Activated
AM FM CD Dash Stereo
Dual 12v Dash Receptacles
Adjustable Gas and Brake Pedals
Cupholders
Snack Beverage Tray

Living Spaces
Power Patio Awning
Patio Light
Entry Door Awning
Electric Entry Step
Stepwell Cover
Vinyl Headliner
LED Ceiling Lighting
Scotchguard Treated Carpet
Vinyl Flooring
Solar Privacy Window Shades
Leatherette Sofa Sleeper
Overhead Cabinets
High Gloss Raised Panel Cabinetry
Ball Bearing Drawer Slides

Dining
Convertible Dinette Sleeper with Storage
Built in Pantry
Solid Surface Countertops
Designer Tile Backsplash
Stainless Steel Double Bowl Sink
Double-Door Refrigerator
2-Burner Cooktop with Hinged Cover
Convection Microwave Exterior Vent

Entertainment & Technology
Systems Center
Multiplex Wiring
Tank Level Monitor System
LP CO and Smoke Detectors
Living Area TV
Home Theater Sound System

Sleeping
Hallway Privacy Door
Solar Privacy Shades
Overbed Storage
Reading Lights
Queen Memory Foam Mattress
Comforter with Throw Pillows
Nightstands
Bedroom TV
Two Wardrobes with Drawers
Four Bed Pedestal Drawers

Bathroom
Vinyl Flooring
Medicine Cabinet Mirror
Solid Surface Vanity Top
Satin Nickel Faucet
Linen Storage
Molded Fiberglass Shower
Shower LED and Skylight
Glass Shower Door
Toilet
FanTastic Fan Exhaust Vent

Mechanicals
20-Gal LP Tank
Two 6v Auxiliary Batteries
50-Amp Service Cord
Inverter for Entertainment Center
110v Exterior Receptacle
6.0 Onan Generator
Extraordinaire AC System
Heated Holding Tank Compartments
6-Gal DSI Hot Water
Black Tank Flush System
Outside Shower Rinse Hose

Coach Build
Steel and Aluminum Structure
Undercoating
Gelcoat Fiberglass Walls
Seamless Molded Fiberglass Roof
Fiberglass Front and Rear Caps
Storage Compartment Lights
Rigid Storage Boxes
Locking Cargo Doors with Gas Struts
Slideout Topper Awnings
Roof Access Ladder
Air Leveling System

Floor Plan

Floor Plan

Dealership Information

Sunday

Closed

Monday

9:00am - 5:00pm

Tuesday

9:00am - 5:00pm

Wednesday

9:00am - 5:00pm

Thursday

9:00am - 5:00pm

Friday

9:00am - 5:00pm

Saturday

9:00am - 3:00pm

Kunes Wisconsin RV World

Disclaimer

Pricing

All recreational vehicle prices shown on this website are for informational purposes only and do not include applicable taxes, title fees, or license fees, which will be due at the time of signing. The advertised price does include our document service fee (referred to in Wisconsin as a Dealer Service Fee) and a mandatory eFiling fee. Document service fees are $377.63 in Illinois and $599.00 in Wisconsin. While Kunes RV Group makes every effort to ensure that advertised prices are accurate, pricing errors may occur. All prices are subject to change without notice. The price you pay will be determined at the time of sale and confirmed in your written purchase agreement. Please contact your local Kunes dealership to verify current pricing before visiting. 

Rebates, Incentives & Advertised Discounts

Advertised rebates, incentives, and discounts are subject to change or expiration without notice and may be subject to eligibility restrictions, including residency requirements, financing source requirements, and recreational vehicle or trim level eligibility. Some incentives require financing through the manufacturer’s captive lender or are available only to residents of specific states or regions. Kunes RV Group works to ensure that advertised incentives are current and accurate; however, we cannot guarantee their availability at the time of your purchase. Please contact a Kunes associate to confirm which incentives apply to your specific recreational vehicle and situation. 

Recreational Vehicle Information & Availability

Vehicle listings on this website are provided for general informational purposes. While every effort has been made to ensure accurate display of vehicle information, including equipment, accessories, colors, and specifications, data is sourced from multiple providers and may not always reflect the exact configuration of a specific recreational vehicle. Recreational vehicle photos may be representative examples of the model and may not depict the actual unit available for sale. Accessories and colors may vary. All inventory is subject to prior sale. Recreational vehicles may be transferred between Kunes RV Group locations at customer request. A $300 transfer fee will be added to the purchase transaction to cover transportation costs when a recreational vehicle is moved from its listed location. To avoid this fee, customers may take delivery of the recreational vehicle at the dealership where it is currently listed for sale. 

General Disclaimer

All information on this website is provided on an “as is” basis without warranty of any kind, express or implied. Kunes RV Group and its third-party data providers are not responsible for errors or omissions in vehicle listings, pricing, or incentive information. Nothing on this website constitutes a binding offer or contract. All sales are subject to a written purchase agreement signed by both the customer and an authorized Kunes RV Group representative. This disclaimer applies to all Kunes RV Group dealership locations in Illinois and Wisconsin and is subject to change without notice. If you have questions about any information on this website or would like clarification on fees, financing, or recreational vehicle details, please contact your local Kunes RV Group dealership. We are happy to walk you through all terms and charges before you make any decisions. Disclaimer Updated – May 2026.   

2018 Tiffin Motorhomes® Tiffin Allegro Breeze

32BR

•

38,662

miles
$1,146
per month
7.99
% APR
20%
Down
180
Months